By Ben Millar · Technical lead
Break-even calculator
How much revenue, and how many completed jobs, would cover your costs? Use fixed costs, typical job revenue and variable job costs from the same planning period to estimate your break-even point.
Calculate your break-even point
Break-even calculator
Example values are prefilled. Replace them with your own estimates. Your inputs stay in your browser.
Months use 52 weeks ÷ 12. Break-even jobs round up to a whole job; revenue uses that job count. Nonpositive contribution displays N/A for break-even. A negative margin of safety means a shortfall.
- Contribution per job
- —
- Break-even jobs per month
- —
- Break-even revenue per month
- —
- Margin of safety (jobs above break-even per month)
- —
Track Revenue and Profit reports from your Housecall Pro data with ServicePro IQ.
Start your free 7-day trialHow it works
- Choose a period, such as a month. Add fixed costs for that period, such as rent, insurance and fixed office salaries.
- Subtract variable cost per job from typical revenue per job. The amount left is each job’s contribution toward fixed costs.
- Divide fixed costs by contribution per job to find break-even jobs. Round up to a whole completed job.
- Divide contribution per job by revenue per job to get the contribution margin as a decimal. Divide fixed costs by that margin to find break-even revenue.
Made-up example: monthly fixed costs of $10,000, revenue of $500 per job and variable costs of $300 per job leave $200 per job. Break-even is 50 completed jobs, or $25,000 in revenue. This assumes the same job mix and costs throughout the month.
Use a positive job revenue and contribution. If variable costs equal or exceed revenue per job, extra jobs at those economics cannot cover fixed costs. Count each cost once: labor that stays fixed belongs in fixed costs; labor that increases with jobs belongs in variable costs.
What to do with the result
Compare the required completed jobs with realistic crew capacity and demand. A plumbing business can review whether repair pricing leaves enough after parts and job labor. An HVAC business should separate service calls from installations if their costs and ticket sizes differ substantially.
If the required workload is unrealistic, test a change in price, variable cost or fixed overhead and recalculate. Use the median ticket as a starting point for typical work, and plan known large projects separately. Break-even covers the costs entered; add a desired profit amount to fixed costs before dividing if you want a revenue target that also leaves that amount.
Keep working on the numbers
Frequently asked questions
Is break-even the same as having enough cash?
No. This calculation compares revenue with costs. Customer payment timing and other cash commitments can leave a cash gap even when the work covers those costs.
Should I include my own pay?
Include the owner pay you want the business to cover. Classify it consistently as fixed or variable for this calculation, and avoid counting it twice.
What if I offer several types of work?
Calculate by job type or use revenue and variable costs weighted to your expected job mix. Recalculate when the mix changes; one typical ticket can hide a costly service line.
Can ServicePro IQ help me review job costs?
Its Profit report lists completed jobs with cost, revenue, profit and profit percentage from your Housecall Pro data. Recording costs in Housecall Pro gives that review its foundation; connecting requires Housecall Pro MAX.
Explore the other free tools
Find the benchmarks self-check and more calculators in our free tools for home-service businesses.
Check the job profits behind your break-even plan
ServicePro IQ’s Profit report lists completed jobs with cost, revenue, profit and profit percentage from your Housecall Pro data. Connect a Housecall Pro MAX account to review the jobs behind your planning assumptions. Start your free 7-day trial, no credit card required.